# Engineer handoff — includes to verify/add before sending
_Source config: DC11_MECH_8964bd_config.json | selection: _DC11_costsheet.pdf_

Only lines CONFIRMED verbatim from the exact model's banked block or this job's selection were placed on the proposal. Add/verify the lines below from the factory selection.

## Item A — MODEL 5WC-6-30x111.25x6-8AL  (Unit Shall Be Rigged As Separate Modules And Installed In Place On Rooftop. Prov)
Confirmed & shipped: 0 includes / 0 not-included.  Source: this job's selection.

**Pending INCLUDES to verify/add (1):**
- [Includes require a banked verbatim for this model OR this job's factory quote (--factory-quote) - STEP 4 gate. Not fabricated.]

**Pending NOT-INCLUDED to verify/add (1):**
- [Per factory quote / banked verbatim - CONFIRM]

