Run result

UNKNOWN Clean run — engineer gives it a final pass before send.
No proposal was produced by this run
Check the QA checklist below, then start a new run — smaller schedule-page PDFs work best.
Scope-gate report — what was quoted, what was excluded, and why
# Gil-Bar one-shot run - Mechanical_Drawings_8_1_355b5b
source: PDF Mechanical Drawings (8) (1).pdf (schedule pages [1, 13, 18, 19]/19, 9 schedules) | entity: GBI | workbook: GilBar_Master_Workbook_UPDATED_v3_21.xlsx | factory quote: DOAS-2_DOAS-2_AAH205G3ASTB2_2_Submittal.pdf (1 blocks)

## QUOTED (0 item(s)) - default-EXCLUDE, only confirmed/banked/factory-quoted lines

## RECOGNIZED - NOT QUOTED (10)
- [BY-OTHERS]  TURYE0723AN40AN   - by-others equipment type
- [BY-OTHERS]  PUYA24NL   - by-others equipment type
- [BY-OTHERS]  TUHYE0963AN41AN   - by-others equipment type
- [NO-MATCH] Modine HER 30  (EUH-1, EUH-2, EUH-3) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] INDEECO 922U03000C   (ECH-1) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] INDEECO 932U01500V   (ECH-2) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] INDEECO 942U01000V   (ECH-3) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] INDEECO QUA   (EDH-1, EDH-2, EDH-3, EDH-4, EDH-7) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] INDEECO FINNED TUBULAR   (EDH-5, EDH-6) - not in library - confirm; do not assume Gil-Bar quotes it
- [NO-MATCH] ? TCMBG0108SJ11N4  (BB-1) - not in library - confirm; do not assume Gil-Bar quotes it

## FLAGS (1) - confirm before final issue
- Quote No.: PROVISIONAL placeholder - replace with the Gil-Bar job-record serial before final issue.

## BUILD / QA
- NO quote-eligible items - recognize/scope-gate report only.

config: /srv/pipeline/GilBar_Builder_v2/Mechanical_Drawings_8_1_355b5b_config.json
Drafts only — every proposal is completed by an engineer before it is sent. No pricing is ever generated.