Run result
Downloads ✎ Edit & regenerate
QA detail
GIL-BAR PROPOSAL QA — Gil-Bar_Proposal_DC11_MECH_8964bd.docx Config: DC11_MECH_8964bd_config.json VERDICT: FAIL ---------------------------------------------------------------- [PASS] Structural validation — valid OOXML (built-in zip + XML parse check) [FLAG] PDF render — LibreOffice render failed — .docx is still valid; render/eyeball manually. [PASS] Letterhead logo embedded — 2 image(s) [FAIL] Header — derivable fields filled — missing/placeholder: Drawings Dated [FLAG] Header — job-record fields pending — Proposal No — supply from the Gil-Bar takeoff/job record before final issue [PASS] Engineer is engineer-of-record (not owner/agency) — engineer of record named: PS&S (owner/agency also shown: NYC DOE (Education) — good, owner/EOR pair) [FAIL] No placeholder tokens in document — found: <CONFIRM> [FAIL] Voltage filled on every row — blank voltage: Item A / Ventrol [PASS] Every item has Includes — all items [PASS] Includes provenance (filtered — confirmed-only shipped) — 0 confirmed line(s) on proposal; 2 handed to engineer via HANDOFF_DC11_MECH_8964bd.md (draft for completion) [PASS] No pricing on proposal (hard rule) — no price present - TOTAL PRICE line left blank [PASS] Full Terms & Conditions present — T&C header + clause 20 found [PASS] Closing note present — found DO NOT SEND until the FAIL items above are fixed.