Run result

FAIL DO NOT SEND — fix the FAIL items in the QA report below, then re-run.

Downloads ✎ Edit & regenerate

QA detail

GIL-BAR PROPOSAL QA — Gil-Bar_Proposal_Flushing_B_SCHEDULES_ONLY_11f199.docx
Config: Flushing_B_SCHEDULES_ONLY_11f199_config.json
VERDICT: FAIL
----------------------------------------------------------------
[PASS] Structural validation  —  valid OOXML (built-in zip + XML parse check)
[FLAG] PDF render  —  LibreOffice render failed — .docx is still valid; render/eyeball manually.
[PASS] Letterhead logo embedded  —  2 image(s)
[FAIL] Header — derivable fields filled  —  missing/placeholder: Drawings Dated
[FLAG] Header — job-record fields pending  —  Proposal No — supply from the Gil-Bar takeoff/job record before final issue
[PASS] Engineer is engineer-of-record (not owner/agency)  —  engineer of record named: Cosentini  (owner/agency also shown: NYC DDC (Design & Construction) — good, owner/EOR pair)
[FAIL] No placeholder tokens in document  —  found: <CONFIRM>
[FAIL] Voltage filled on every row  —  blank voltage: Item A / International Environmental Corp (IEC); Item A / International Environmental Corp (IEC); Item C / United Cool Air
[PASS] Every item has Includes  —  all items
[PASS] Includes provenance (filtered — confirmed-only shipped)  —  0 confirmed line(s) on proposal; 159 handed to engineer via HANDOFF_Flushing_B_SCHEDULES_ONLY_11f199.md (draft for completion)
[PASS] No pricing on proposal (hard rule)  —  no price present - TOTAL PRICE line left blank
[PASS] Full Terms & Conditions present  —  T&C header + clause 20 found
[PASS] Closing note present  —  found

DO NOT SEND until the FAIL items above are fixed.
Drafts only — every proposal is completed by an engineer before it is sent. No pricing is ever generated.